During excavation of contaminated soil, BHE unexpectedly discovered the 10,000-gallon Underground Storage Tank (UST) filled with concrete, and the second 1,000-gallon UST; both assumed to have been previously removed.
BHE removed the 10,000-gallon UST and completed a closure in place of the 1,000-gallon UST due to the tank’s proximity to an adjacent building.